
CGH WARD 65 | 66 D&B WORKS
CHANGI GENERAL HOSPITAL

OVERVIEW
Design and Build project for the upgrading and reconfiguration of Ward 65 & Ward 66 at at Level 5 & 6 of Changi General Hospital. The works focused on enhancing patient care environments, improving functionality, and ensuring compliance with healthcare standards while maintaining ongoing hospital operations.
KEY AREAS
PATIENT WARDS


NURSE STATIONS

MEDICATION ROOM

ENSUITE TOILET



LAST OFFICE

STAFF LOCKER AREA

WORKS DONE
-
Demolition and modification of existing structures
-
Construction of new walls and acoustic partitions
-
Installation of doors with access control systems
-
Wall, floor, and ceiling finishes (including medical-grade materials)
-
Installation of anti-microbial vinyl and anti-slip tiles
-
Custom joinery and built-in furniture (cabinets, nurse stations, lockers)
-
Bed head panels, curtain tracks, and patient support systems
-
Toilet upgrading with sanitary fittings and waterproofing systems
-
Installation of signage and wayfinding systems
-
Integration and coordination with M&E and hospital systems
-
Testing, commissioning, and final handover documentation

A SUCCESS STORY
This project was successfully delivered as a comprehensive healthcare facility upgrade, combining functionality, durability, and patient-centric design. The completed works enhance operational efficiency for medical staff while providing a safer, more comfortable environment for patients, fully aligned with hospital standards and regulatory requirements.























