top of page

CGH WARD 65 | 66 D&B WORKS

CHANGI GENERAL HOSPITAL

CGH WARD 65 66 67.jpg

OVERVIEW

Design and Build project for the upgrading and reconfiguration of Ward 65 & Ward 66 at at Level 5 & 6 of Changi General Hospital. The works focused on enhancing patient care environments, improving functionality, and ensuring compliance with healthcare standards while maintaining ongoing hospital operations.

KEY AREAS

PATIENT WARDS

CGHWD-26.jpg
CGHWD-24.jpg

NURSE STATIONS

CGHWD-8.jpg

MEDICATION ROOM

CGHWD-54.jpg

ENSUITE TOILET

CGHWD-32.jpg
CGHWD-33.jpg
CGHWD-22.jpg

LAST OFFICE

CGHWD-37.jpg

STAFF LOCKER AREA

CGHWD-46.jpg

WORKS DONE

  • Demolition and modification of existing structures

  • Construction of new walls and acoustic partitions

  • Installation of doors with access control systems

  • Wall, floor, and ceiling finishes (including medical-grade materials)

  • Installation of anti-microbial vinyl and anti-slip tiles

  • Custom joinery and built-in furniture (cabinets, nurse stations, lockers)

  • Bed head panels, curtain tracks, and patient support systems

  • Toilet upgrading with sanitary fittings and waterproofing systems

  • Installation of signage and wayfinding systems

  • Integration and coordination with M&E and hospital systems

  • Testing, commissioning, and final handover documentation

A SUCCESS STORY

This project was successfully delivered as a comprehensive healthcare facility upgrade, combining functionality, durability, and patient-centric design. The completed works enhance operational efficiency for medical staff while providing a safer, more comfortable environment for patients, fully aligned with hospital standards and regulatory requirements.

PHONE 6782 5593

FAX 6782 0190

Blk 9005, Tampines Street 93, #02-228 Tampines Industrial Park A, Singapore 528839

  • googlePlaces
  • facebook

©2022 by Mactech Engineering & Trading Pte Ltd.

bottom of page