NUH INPATIENT OPERATION & SPECIALISED SUPPORT SERVICES

NUH KENT RIDGE WING LEVEL 5

BANNER.jpg

OVERVIEW

This project encompasses full interior design, architecture, mechanical, electrical, and plumbing (MEP) design and construction works for the relocation of NUH’s Inpatient Operations (IPO) and Specialised Support Services (SSS) from Tower Block Level 6 to Kent Ridge Wing Level 5. Covering approximately 300 square metres, the multi-disciplinary Design & Build scope was executed within a live, sensitive hospital environment, balancing stringent infection control, site acoustics, and dust management with a compressed 3-month project duration.

KEY AREAS

OFFICE WALKWAY

001.jpg

DRY PANTRY

021.jpg

BREAKOUT AREA

007.jpg

IPO AND SSS OFFICES

019.jpg

ACOO & HOD OFFICES

025.jpg
028.jpg

WORKS DONE

  • Site clearing, hacking, floor leveling, and removal of old interior/M&E fittings.

  • Space planning, custom interior design, and 3D visual mock-ups.

  • Installation of new carpet tiles, timber skirtings, down-hung ceilings, and partition walls.

  • Custom cabinetry, modular office workstations, and window ledge seating.

  • Privacy screen installations using vertical slats, lockers, and frosted glass.

  • Full toilet renovation, including tiling, plumbing, waterproofing, and LED mirror cabinets.

  • Complete lighting upgrade with energy-efficient LEDs, downlights, and emergency lights.

  • Power, data (CAT 6A), card access, and Public Address (PA) system installation.

  • Air conditioning and ventilation (ACMV) modifications, duct replacement, and new grilles.

  • End-to-end statutory authority submissions, LEW certifications, and PE endorsements.

A SUCCESS STORY

Transforming a complex site located directly above operating clinics and below patient wards into a modern, functional workspace required seamless operational coordination and clever spatial problem-solving.

A standout highlight of the project was overcoming spatial challenges—most notably in the non-standard, triangular layout of the Assistant Chief Operating Officer (ACOO) office. Through custom-designed layout solutions, clever cabinetry alignment, and simulated natural lighting via LED paneling, the space was transformed from a tight, disorienting room into an inviting, high-functionality executive suite.

Furthermore, by integrating built-in cushion seating along unused window ledges and deploying modular workstation configurations, the design optimized every square meter to foster collaborative, face-to-face teamwork while maintaining necessary visual and acoustic privacy. All works were completed safely and quietly without interrupting day-to-day healthcare delivery in neighboring hospital units.

PHONE 6782 5593

FAX 6782 0190

Blk 9005, Tampines Street 93, #02-228 Tampines Industrial Park A, Singapore 528839

  • googlePlaces
  • facebook

©2022 by Mactech Engineering & Trading Pte Ltd.

bottom of page